Journal Entry 3 P1
Project T » Devlog
Date: 7.3.2023
Activity:
- Finished 1st part of Scripting Walkthrough
- Set Visual Studio IntelliSense
Notes:
I like document format with its Hints and Solution sections.
I was stucked on using ScriptableObject. In the end I found out that I had accidentally set the bullets color with an alpha channel equal to 0, so the bullets were invisible. I am not sure whether the example code (from Solution section) would compile though.
Invested hours:
3.5 hours after Lab
Outcome:
Build (uploaded to the itch.io page as a .zip file)
Files
Scripting.zip 97 MB
Mar 07, 2023
Get Project T
Project T
mff-gdintro-2023-t
Status | In development |
Author | dk1248 |
Genre | Platformer |
More posts
- Journal Entry 5Mar 31, 2023
- Journal Entry 4Mar 20, 2023
- Journal Entry 3 P2Mar 10, 2023
- Journal Entry 2Feb 28, 2023
- Journal Entry 1Feb 21, 2023
Leave a comment
Log in with itch.io to leave a comment.